Creamino™ for investors

БГ · EN

Short presentation · November 2026

Creamino™ turns the Wi-Fi signal around a sports pitch into a map of turf moisture and hardness – around the clock, with no buried sensors. It is sold as a subscription: 93 % of the revenue from one pitch is recurring.

The problem

Turf condition is checked by hand, a few times a season, at single points. Between measurements the turf manager and the coach decide by eye – when to irrigate, where to train, whether the pitch is ready for a match.

The solution

  • Field Kit – 6 Wi-Fi nodes, edge node, weather station and solar power around the pitch (target architecture, being built and tested).
  • Surface Hub – browser portal: 1×1 m map, alerts and zone tasks.
  • Calibration – against reference instruments (TDR, Clegg) at every site; this is also our moat.

Where we are

StageStatus
MethodTested on the Terrain 1 test field, Burgas: N = 56, 8 sessions; ±2.35 % moisture on an unseen session. One site, one season. Results →
PilotLazur stadium, FC Neftohimik Burgas 1962 – starting 2026
Intellectual propertyPatent application BG/P/2026/114303, filed 16 March 2026
FundingApplication under the EU programme “Competitiveness and Innovation in Enterprises” 2021–2027, procedure BG16RFPR001-1.010
RecognitionAward of the Bulgarian Golf Association, National Sports Academy Day 2026
ProductPublic price list; portal demo; Field Kit being built

Business model

The core Stadium plan costs €590 a month on a 24-month contract plus €1,500 installation (excl. VAT). Around it: Start assessments (€1,200), Pro seasonal monitoring (€290/month), kit purchase (€5,900) and calibration (€490). All prices →

Unit economics of one pitch (Stadium plan)Value
Gross profit€326 a month · 55 % margin
Upfront cash (installation fee less kit and installation cost)−€890
Payback6.3 months
Lifetime revenue per customer€22,740
Customer lifetime value (LTV) / acquisition cost (CAC)€12,670 · 8.4×
Recurring share of revenue93 %
Point Surface model. The kit cost (€1,840) is a component-level estimate, to be confirmed once the kit is built.

Three-year plan: revenue €48,900 → €145,000 → €313,360, gross margin about 57–58 %. This is a plan, not reported results.

Market

  • More than 400,000 football pitches in Europe (all surfaces), mapped by UEFA. UEFA, 2026
  • 673 top-division clubs with 950 training facilities; over €1 billion invested in facilities in five years. UEFA, 2020
  • 7,939 golf courses in Europe (2024), 9 of them in Bulgaria. The R&A, 2025

Initial focus: professional stadiums and training grounds in Bulgaria, North Macedonia and Albania, where we have already carried out field assessments; then golf courses and municipal pitches.

Scalability

  • One kit per pitch – installed outside the playing area, no construction work.
  • The software runs in the browser; the satellite layer works anywhere without hardware.
  • The calibration method can be taught and handed to partners country by country.
  • Data from each new pitch improves the model for the next.

Risks

The method is tested on one site over one season; stadium validation is still ahead. Field Kit is not yet built and tested. The team is small. The EU funding is an application, not an approval.

Talk to us – investors and strategic partners. Plamen Mateev, landscape architect, founder and managing director of Point Surface Ltd. · +359 896 600 889